AL BURJ Engineering Consultants Traffic & Transport
About

Specialists inside an
established firm.

The traffic engineering and transport planning division of AL BURJ Engineering Consultants — a UAE consultancy operating since 1982.

1982
Firm founded, Abu Dhabi
371+
Studies registered with ITC
9
Service lines
4
In-house tools
The Division

We do one thing, deeply.

We turn the movement of a development into engineering an authority can approve.

AL BURJ Engineering Consultants has worked across the UAE since 1982, with hundreds of projects delivered firm-wide across engineering disciplines. This division carries the traffic and transport work — 371 studies on the ITC register — from single-plot impact studies to master plans spanning whole communities.

Being part of a broader engineering practice means a traffic study rarely sits in isolation. Access, parking, drainage constraints and building design get resolved alongside the transport case, not thrown over a wall. And because we work with ITC, RTA and ADM day in and day out, we structure a study for the reviewer from the first page — which is usually the difference between one review round and three.

How we work

Three things we don't compromise on.

01 Every figure verified

Numbers over adjectives. We keep a standards library and run internal review gates so that every rate, result and figure on a study can be traced and defended.

02 The reviewer's language

We work to the current guidelines — ADG-039-2024, the Trip Generation & Parking Rates Manual, Plan Capital 2040 — and design submissions the way the authority reads them.

03 Tools we build ourselves

Our engineers write their own analysis and reporting software. It keeps figures consistent, QC'd and fast — and lets us take on work that would otherwise need bought-in tooling.

The team

Transport planners, modellers, CAD & GIS.

A focused team that covers the whole study chain — so the modeller, the junction engineer and the person drawing the submission are working from the same numbers.

Transport planning & strategy
STEAM macro modelling (MMR/MFR)
Trip generation & parking demand
Junction analysis (SIDRA/Synchro)
Parking & circulation design
ITC/ADM submission drawings & GIS
School & institutional studies
Road safety & active travel
In-house R&D

We invest in our own engineering software.

The division builds and maintains its own suite of QGIS and analysis tools — model reporting, junction analysis, trip distribution and trip-generation engines. It's a deliberate investment: consistent, auditable figures, faster turnarounds, and capabilities that keep the team ahead of a brief.

This tooling and automation system was conceived and built in-house by our team head.

Recognition

Recognised by the authority we submit to.

In December 2024 the Integrated Transport Centre presented AL BURJ with a Thanks & Appreciation Certificate for outstanding performance in Transport Impact Studies — signed by the Executive Director, Planning & Strategic Affairs Sector.

  • ITC recognition for TIS performance, 2024
  • ITC pre-qualified for transport studies
  • Approved STEAM modeller and model technician on staff
  • ITC-approved road safety audit team members
Integrated Transport Centre Thanks and Appreciation Certificate presented to AL BURJ for outstanding performance in the TIS Study during 2024
Integrated Transport Centre · 12 December 2024
How a study moves

Six stages, registration to approval.

01 Register

Scope and register the study with ITC on the correct track.

02 Methodology

Agree assumptions, rates and modelling approach up front.

03 Analysis

Trip generation, STEAM modelling and junction analysis.

04 Report

A defensible study with QC'd figures and drawings.

05 Review

Respond to reviewer comments through the MMR/MFR cycle.

06 Approval

Cleared for the next stage of the development.

Careers

Good with numbers and networks?

We're always glad to hear from transport planners, modellers and CAD/GIS engineers who care about getting it right. Reach us through the parent firm.